• Room 602, Building 11, Ruri Commercial Park No. 3855 Shangnan Road, Pudong New Area Shanghai 200125, China

Jergens ZPS SP140 & SP141 Pull Studs

ZPS SP140 & SP141 Pull Studs

Zero Point System · Jergens Workholding

ZPS SP140 & SP141 Pull Studs

Jergens SP140 & SP141 Pull Studs are designed for our ZPS SP140 & SP141 Clamping Modules.

Features & Specifications

  • Material: Hardened Stainless Steel
  • Installation diagrams available upon request
  • SP140 & K02 Installation Clamping Modules
  • Select a part number for CAD drawings, price and stock availability.
  • Inch Metric

Specification Table

Part Number CAD Unit Size Description DN (mm) D1 (mm) H (mm) H1 (mm) M T (mm) T1 (mm) TORX Weight (g)
564840 Metric SP140 / SP141 Zero Point Stud 7 5 11.2 8.7 M3 x 0.5 2.5 4.5 T8 2
564841 Metric SP140 / SP141 Timing Stud 7 5 11.2 8.7 M3 x 0.5 2.5 4.5 T8 2
564842 Metric SP140 / SP141 Clearance Stud 6.96 5 11.2 8.7 M3 x 0.5 2.5 4.5 T8 2

Compiled from the Jergens product pages. For CAD drawings, full catalogs, lead time and quotation, contact ELINK — seventeen years of MRO expertise behind every recommendation.

ELINK (Shanghai) Industrial & Trade Ltd. · Jergens Workholding Supply

Email: art@elinkmro.com
Tel: +86 21 5017 0881
Mobile/WeChat: +86 138 1777 5656
Add: Room 602, Bldg 11, 3855 Shangnan Rd, Pudong, Shanghai

← Back to Zero Point System